Manufacturing Engineering Jobs

筛选

我最近的搜索
筛选项:
预算
类型
技能
语言
    工作状态
    10 份搜到的工作,货币单位为 HKD

    We are looking for an Academic Content writer with knowledge in Manufacturer of process equipment. We request you to start your message with the solution for 13+34, so that it will be clear that you have read the instructions. Don't reply if you don't have portfolio/samples or are not fine with the budget. *Budget*: 8000.00 – 10000.00 INR

    $730 (Avg Bid)
    $730 平均报价
    3 个竞标

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $233 - $1941
    $233 - $1941
    0 个竞标

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $753 (Avg Bid)
    $753 平均报价
    4 个竞标

    Manufacturing Engineer Packaging SImulation Modelling simulation using tecnomatix plant simulation 15

    $233 (Avg Bid)
    $233 平均报价
    1 个竞标

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $544 (Avg Bid)
    $544 平均报价
    3 个竞标

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $1204 (Avg Bid)
    $1204 平均报价
    2 个竞标

    Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

    $233 - $1941
    $233 - $1941
    0 个竞标

    The Proposals written must include: *Research Proposal* – (2-page limit research proposal plus an additional page for references, strictly enforced): Specifically and clearly state the research question to be investigated, including your activities and goals. Also, include how your research aligns with one of the Ira A. Fulton Schools of Engineering research themes. *Bibliography* – ...

    $629 (Avg Bid)
    $629 平均报价
    9 个竞标

    AUTOMATED MAINTENANCE OF PROTECTION SYSTEMS (AMPS) CHALLENGE Make power systems more reliable by automating maintenance testing of protective relays and associated potential and current transformers. IMPORTANT: PLEASE READ THE FULL CHALLENGE BRIEF THAT CONTAINS ALL THE CHALLENGE AND SUBMISSION REQUIREMENTS AND RULES ([登录来查看链接]) If you have any questions please refer to our FAQ first: [登录来查看...

    $77648 (Avg Bid)
    加精 加保 加封 顶级竞赛
    $77648
    31 项参赛作品