design procdures and procurement - 27/03/2017 10:18 EDT

已完成 已发布的 7 年前 货到付款
已完成 货到付款

Instruction to students

Produce a fully referenced 1500 word written review on A3 sized sheets and

supporting A3 digital portfolio/ study sheets to demonstrate your understanding of

“Design Procedures and Procurement” tasks undertaken by the building team/

stakeholders when using the RIBA Plan of Work (POW 2007/ 2013) for an

architectural design commission.

Include appropriate sections of written work and select suitable visual examples of

typical outputs/ communications (written, numeric, tabular, and graphical) produced

by the building team/ stakeholders throughout all the differing RIBA Workstages:

Building Team/ Stakeholders & Appointments

 Identify stakeholders and summarise their roles and responsibilities from the

start to completion of an architectural commission.

 Show how stakeholders attain their professional status and state which

professional body they would be registered with.

 What forms of appointment would each stakeholder sign with the client and

record the professional fees charged by each for an architectural commission.

Types of Architectural Practices and Human & Physical Resources

 Record the differing types of professional Architectural practices that are

currently used within the construction industry and show typical projects that

have been undertaken by small, medium and large practices.

 How would an architectural practice be setup and what typical human and

physical recourses would be used to manage manual and technology based

working practices.

2

RIBA POW (2007/2013) & Procurement paths

 State the purpose of the RIBA Plan of work, record the differing stages and

note the roles and responsibilities of stakeholders using this document.

 Identify various procurement paths, state their key advantages &

disadvantages and show typical architectural projects that have been

successfully built using these procurement paths.

Bill of Quantities, Costing/ Estimating

 What is the purpose of a Bill of Quantities (BOQ), which stakeholders are

involved in producing this document and how is it used to control design

quality, costs and predict site construction time scales for a project.

Tendering:

 Which stakeholders are normally involved in tendering actions and what

typical documents would be included to form a tender package comprise.

 Explain the process of single & two staged tendering, state their advantages

& disadvantages and record typical management and administrative

procedures that are implemented to successfully select a Main Contractor?

Types Contracts

 Make a comprehensive list of typical building contacts that are used in

construction, state their advantages & disadvantages and show completed

architectural projects built by a Main Contractor by using these contracts.

 State typical factors leading to the termination/ “determination” of a contract

and record the procedures used by the Main Contractor and stakeholders.

Main Contractor Project Management & Contract Administration:

 What are the roles & responsibilities of the Main Contractors and associated

stakeholders in the areas of project management and contract administrative

procedures for site mobilisation and safe site construction work?

 How is the quality of workmanship by trades/ site workers, budgets &

construction progress monitored by the Main Contractor and stakeholders?

 State the Main Contractor and stakeholders procedures used in the handover

of a completed building, providing feedback and aftercare during the “defects

liability period” to repair faults and carry out maintenance in the future.

报告写作

项目ID: #13533523

关于项目

13个方案 远程项目 活跃的7 年前

授予:

PhDWriter12

Hello Sir/Mam We are result oriented and highly versatile professional writers having 9+ years of experience. Satisfaction is our top Priority. We have written hundreds of Academic Writing, Technical and Report Writin 更多

£61 GBP 在3天内
(188条评论)
6.6

有13名威客正在参与此工作的竞标,均价£132/小时

Valuesolutions

Hello, how are you? I hope you have a bright day/evening from your side. I have read the details provided, but please contact me so that we can discuss more on the project. I believe I have the required skills in this 更多

£52GBP 在1天里
(126条评论)
6.8
sheak

Hello! If you want your report writing/report to be done by a qualified and professional PhD level technical writer, please feel free to contact me at your earliest. I am as excited as you to present this report in won 更多

£200 GBP 在3天内
(149条评论)
7.1
softechinfinites

Hello, I have 4 years experienced in Articls/Content/Academic writing and assure you the quality work on time as per your requirements. I will provide plagiarised free content with in the deadline and available to 更多

£47 GBP 在3天内
(100条评论)
6.3
Jasmine64

I am well versed in Academic & Content Writing. I have some unique skills in research and all the appropriate formatting styles/methods. My freelancing approach is to put the interests of all my clients first with an a 更多

£111 GBP 在3天内
(41条评论)
5.5
B2BDigitizer4

Hello there I read your project description very carefully & I can do this job for you. I will provide you with best quality work you’re looking for within your time and budget. Kindly visit my portfolio to check my q 更多

£200 GBP 在2天内
(3条评论)
3.7
ManjulAwasthi

Hi I am an MBA and PMP with over 10 years experience in Supply Chain in the Military. My understanding of supplier/vendor relationship management and procurement practices is phenomenal. Sure can take your work.

£250 GBP 在8天内
(5条评论)
3.6
rakeshwadhwani

Dear Valued Employer, I can add value to your project, by suggesting new ideas. I am fast and reliable. For further understanding why I am the right firm for your project, kindly check my profile, reviews, rating and 更多

£150 GBP 在3天内
(6条评论)
3.9
adebowaleali

A proposal has not yet been provided

£111 GBP 在3天内
(0条评论)
0.0