3D modelling of WtE plant, Myanmar
已取消
已发布的
5 年前
货到付款
₹400-750 INR/小时
已取消
Waste to energy plant complete modelling.
Manufacturing drawings of boiler.
项目ID: #19032429
关于项目
1个方案
远程项目
活跃的5 年前
1 威客就此工作平均出价 ₹500
irfanali427
Hello there, I have read the project description and completely understand that you need 3d model of a Waste to Energy Power plant which happens to be my FYP. Please visit my portfolio to see the animation. I have do 更多
₹500 INR / 小时
(7条评论)
3.5