Creating Mechanical/Air Conditioning Equipement Schedules

已关闭 已发布的 Feb 23, 2015 货到付款
已关闭 货到付款

Review mechanical (sometimes architectural) plans for high rise buildings, on a per floor basis. Mark up the floor plan in pdf editor and put together an excel spreadsheet summarizing counts and ac equipment orientations. Equipment type on floor plans is always tagged and labeled. Total counts, summary of unit hangings and room tags are missing however, need this info summarized line by line in an excel sheet.

Projects will entail approximately 10 or more floor plans to be reviewed at a time. Simple work, requires attention to detail and common sense to recognized obvious interference/mistakes in the plans. Looking for longer term partnership.

空调 施工监测 数据输入 机械工程

项目ID: #7195543

关于项目

1个方案 远程项目 活跃的Apr 2, 2015

1 威客就此工作平均出价 $115

WordSmith365

Hi, I have been a freelancer for a few years. Along with a writer i have experience in data entry planet. I am a hard worker who meets all deadlines and produces quality work in a timely manner. I am a fast learne 更多

$115 CAD 在3天内
(0条评论)
0.0