Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

Manufacturing Engineering

项目ID: #30620675

关于项目

1个方案 远程项目 活跃的2 年前

1 威客就此工作平均出价 $200

wtomazini13

Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks

$200 USD 在10天内