Specialist Exchange /AD Certified
Exchange / AD / Security
FORMATION / TRAINING
2003 – 2007 CNAM - Architecte du système informatique (IT Architect)
1999 BTS Informatique industriel
1994 BAC F3 Electro-technic
English Technical / Operational
Certifications
➢ On going : MCSE: Messaging - Solutions Expert
➢ Microsoft - Core Solutions of Microsoft Exchange Server 2013 (70-341)
➢ Microsoft – Advanced Solutions of Microsoft Exchange Server 2013 (70-342)
➢ Microsoft – MCITP – Enterprise Messaging Administrator on Exchange 2010 (70-662 et 70-663)
➢ Microsoft – TS – Configure Active Directory 2008 (70-640)
➢ Microsoft – MCITP - Install/configure a server Exchange 2007
➢ Microsoft Certified Systems Engineer (MCSE 2000 – option réseau)
➢ Microsoft Certified Systems Administrator: Messaging (MCSA 2000 – option messagerie)
➢ Microsoft Certified Systems Administrator (Mcsa 2000 – option réseau)
➢ Citrix Certified Administrator for Presentation Server 4
➢ Citrix Certified Administrator for Métaframe XP Presentation Server FR3
MAIN PROJECTS
➢ Project leader: Transitioning messaging system from Exchange 2003 to Exchange 2010
• Definition plan / Design (Hi Availability / site resiliency)
• Define the migration path
• Delegation plan RBAC
• Routing STMP flow
• Test plan (test environment)
• Deployment of the target solution
• Technical Documentation
• Guidance
Missions: Ingenico: 5000 users, Bull (City Hall of Colomiers) : 1000 users, Bull (Défenseur des droits) : 1000 Users, Bull (University of Nîmes) : 9000 Users, Bull (ATM) : 600 Users, Bull (City hall of Boulogne sur mer) : 500 Users.
➢ Manage transitioning / migration from Exchange 2003 to Exchange 2010
• Define migration path
• Build a test environment
• Deployment
• User supports
• Formation (Skills transfer to the local IT)
Missions: Codalis : many customers dealing between 100 et 600 Users, SCC (Darty) : more than 15 000 Users, IBM (Atos) : 80 000 Mailboxes
➢ Manage migration from heterogeneous messaging (Exchange, Domino, Sun) system to Exchange 2007
• Define migration path
• Build a test environment
• Deployment
• User supports
• Formation (Skills transfer to the local IT)
Missions:
SCC (ASF) : 20 000 mailboxes
➢ Manage migration from Domino messaging system to Exchange 2007
• Define migration path
• Build a test environment
• Technical documentation
IT SKILLS
Infrastructures: Active Directory 2000 to 2012
Messaging: Lotus Domino, Sun Messaging System, Exchange 2000 à 2013, Cluster, DAG, CAS Array, IronPort, Lync, Blackberry, ActiveSync, ISA, TMG
Archiving: Symantec Enterprise Vault, Exchange, and Quest Archive Manager
Scripting: Vbs, PowerShell (1,2,3)
MISSIONS DETAILS
March 2014 to September 2014 MichaelPage
Consultant Active Directory & Exchange
Projects:
➢ Maintain Active Directory and Exchange Europe Infrastructure
➢ Configure Exclaimer
➢ Support level 3
Environment: Windows 7,8, Active Directoy 2000, 2003, 2008r2, Quest, Powershell.
February 2014 VERTEGO (training center)
Tutor / PMO Exchange
Projects:
➢ Migration from Active Directory 2000 and Exchange 2000 to Active Directory 2008r2 and Exchange 2010 under Hyper-V.
➢ Deliver Exchange 2010 trainings
➢ Audit, Guidance, Architecture design.
September 2013 January 2014 TIGF
Consultant Active Directory
Projects:
➢ Split Active directory From TOTAL To TIGF & Consolidate old multiple domains to a brand new Active Directory 2012 mono Domain.
➢ Resource migration: User, Group, Computer, Server
➢ Migrate Business Servers
➢ Migrate Database Servers
➢ Assist Messaging system outsourcing
Environment: Windows 7, Active Directoy 2000, 2003, 2012, Quest, Powershell and vbs Scripting
July 2013 VERTEGO
Consultant Exchange 2010
Projects:
➢ Recovering Exchange 2007 Data from Backup and old archives.
➢ Migration from Exchange 2007 to Exchange 2010
➢ Set a Backup / Recovery Plan.
➢ Migration from ISA 2004 to Forefront TMG 2010.
June 2012 June 2013 INGENICO
Consultant Exchange 2010 / Active Directory 2008r2
Projects:
➢ Design definition of Exchange 2010
➢ Configuration of SMTP Gateway (IronPort)
➢ Migration to Exchange 2010.
➢ High availability solution (DAG, HLB)
➢ Take a part of MS Lync project
➢ Configuration of Forefront TMG
➢ Migration to Active Directory 2008 R2
Environment: Windows XP, Windows 7, Windows 2003 & 2008r2, Cisco, Exchange 2003,
Exchange 2010, Active Directory 2008 R2, IronPort, Lync, Forefront TMG,
Virtualization VMware
April 2011 to June 2012 MISSION BULL
Architect Exchange 2010 / Active Directory 2008r2
Projects:
➢ Take a part of many projects for different customers:
➢ Migration to Exchange 2010.
➢ High availability solution (DAG, NLB, HLB)
➢ Configuration of SMTP Gateway (Postfix, Pix, Fortimail,)
➢ Installation of Unified Messaging
➢ Installation & configuration of Enterprise Vault
➢ Migration to Active Directory 2008 R2
Environment: Windows XP, Windows 7, Windows 2003 et 2008r2, Cisco, Exchange 2003, Exchange
2010, Enterprise Vault 9 et 10. Active Directory 2008 R2. Virtualisation VMware
Hyper-V
Sept 2010 to March 2011 ALSTOM
Consultant Systems & Networks
➢ Design Network architecture
➢ Design Active Directory 2003 / 08, DNS, DHCP, GPO
➢ Define a deployment solution for WorkStation
• WDS
• MDT : built a specific master ( base application, drivers)
• POC
• Respect of internal process
• Respect of project delay defined upstream
Environment: Windows XP, Windows 7, Windows 2003 et 2008, Cisco, Blue Coat,
Checkpoint
August 2010 EADS
Consultant Citrix
➢ Guidance, Architecture design
➢ POC
Environment: Citrix Xen App, Citrix XenDesktop, Citrix Provisionning Services
March 2010 à August 2010 CLUBS Bouygues Telecom
Support Engineer Level 3
➢ Support Level 3 office
➢ Engineering – Provide infrastructure for new business workflow
➢ Support & upgrade of the following platform: Exchange, Citrix, Active Directory
➢ Installation of SharePoint , MOSS 2007
Environment: AD 2003, Windows 2003 & 2008, Citrix Presentation Serveur 4.5 Citrix Access
Gateway, SCOM 2007, LanDesk, BackupExec
February 2010 ROLEX - Genève
Consultant Citrix
➢ Define migration way
➢ Migration from Presentation Server 4.0 to Citrix XenApp 5.0 of all their environment
➢ Upgrade of ThinPrint 7.6 platform (printing solution)
Environment: Citrix Presentation serveur 4.0, Xen App, Windows 2003, ThinPrint 7.6
October 2009 to December 2009 BULL – CHU Lyon
Architect Exchange
➢ Validation of the previous proposal
➢ Installation of a new Exchange 2007 infrastructure with High Availability
➢ Load Balancing, CCR
➢ Migration (transition) from Exchange 2003 to Exchange 2007
➢ Configuration of smtp flow between Exchange 2007 And Sun messaging 6.3
➢ Configuration of an SMTP Gateway.
➢ Documentation
➢ Supports
Environment: Echange 2003, Exchange 2007, Windows 2008, Sophos pure message
August 2009 to October 2009 IBM Thales
Architect Exchange
➢ Build an infrastructure to allow migration from many heterogeneous messaging systems to Exchange 2007.
➢ Define migration path
➢ Test plan.
➢ Documentation
Environment: Exchange 5.5, Exchange 2000, Exchange 2003, Exchange 2007, Windows 2008
May 2009 to Jully 2009 CMA CGM System
Deployment of an Africa Office
➢ Deploy a new infrastructure included, network, systems, domains, backup, antivirus, common infrastructure needs and business applications.
Environment: Windows 2003, Windows 2008, BackupExec, WSUS, SCCM, SCOM, ISA 2006,, Ttrend Micro
February 2009 to May 2009 PROTEGYS
Citrix Specialist Xen app
Environment: Citrix PS4.5, Xen app, Secure Gateway 3.01
February 2009 TRANSDATA
Citrix Specialist Xenapp
➢ Upgrade and Guidance to move Citrix Infrastructure to a new Datacenter.
Environment: Citrix PS4.5, Xen app
February 2009 OpenID
Microsoft Consultant
Migration from SAMBA to Active Directory 2003
Migration from Horde Messaging (horde) TO Exchange 2007
➢ Define a proposal
➢ Audit
➢ Test & POC: define the igration way with ADMT tool
➢ Define new group policy to configure Outlook with Exchange.
➢ Installation & configuration of Exchange 2007
➢ Migration
Environment: SAMBA 3 OpenLDAP, Active Directory 2003, Exchange 2007
400 users
July, August, Oct, Dec 2008 Rolex (Genève)
Citrix Specialist
➢ Audit
➢ Proposal: guidance to hardening Citrix Infrastructure
➢ POC
➢ Validation
Environment: Citrix PS4, Secure Gateway 3.1, W2000 W2003
April to December 2008 Codalis (Genève)
Consultant
Many missions:
➢ Audit
➢ Migrations from Domino Exchange, BlackBerry
➢ Migration of customers infrastructure to a DataCenter
➢ Studies and documentations:
➢ Audit
➢ Specifications
➢ Architecture design
➢ Functional specifications
➢ Deployment
➢ User supports
➢ Validation / Kick off
Environment: Windows 2003, DFS, DNS, DHCP, WINS, Citrix PS4.5, Exchange 2007,
BackupExec, Symantec Endpoint
June 2008 Darty (Paris)
Architect Exchange 2007 / Active Directory
➢ Migration from Lotus Domino and Exchange 2003 to exchange 2007 :
➢ POC:
o Definition of messaging flow
o Migration plan
o Installation of the target solution
o Support of deployment
Environment: Windows 2003, Exchange 2007 SP1, Exchange 2003, Domino 7, Active
Directory 2003, many roots, cluster
February to September 2008 Communauté d’agglomération de Nice
Expert AD /Exchange 2003
Audit AD /Exchange:
➢ Resolution of anomalies
➢ Guidance to upgrade Active Directory architecture.
➢ Guidance for tuning Exchange cluster
Environment: Windows 200X, Exchange 2003 cluster win2003
January to September 2008 Conseil Général 13
Expert technique
Migration of a Novell infrastructure to Active Directory 2008
➢ Specification details for the users migration
➢ Specification details for the migration / reorganisation of the file servers (DFS)
➢ Deployment
Environment: Windows 200X, Novell 4.2, RDP 3.1, DFS, ABE
October 2007 to January 2008 Schneider Electric
System Engineer
Migration of a Novell infrastructure to Active Directory 2003
Take a part of many projects:
➢ Define all ITIL documentation for support Level 1 & 2
➢ Specification of the delegation fro Exploitation tasks in Active Directory.
Environment: Windows 200X, Novell 4.x, DFS, DFS-R, Backup Exec
Context international
December 2007 Fondation Lenval
Citrix Expert
➢ Installation & configuration of Citrix PS4.5
Environment: Windows 2003, Linux Bind, Citrix PS4.5
Sept 2007 to Oct 2007 ALTADIS
Project Engineer
Take a part on different projects:
➢ Migration of a backup infrastructure (700 targeted servers)
➢ Shell scripts to allow the inter connexion between SAP R3 application
➢ Creation of Netbackup report solution
Environment: HPUX, AIX, Windows 2000, Net backup, Data Protector
European Context
July 2007 to Sept 2007 AREPEGE
System Engineer
➢ Support VIP / Mobility
➢ Exploitation of BlackBerry servers
➢ Creation of a national VIP Support
➢ Creation of an Exploitation tool to administer BlackBerry (VB.NET)
Environment: Windows 200X, Exchange 2003 (20000 mailboxes), Cluster,
BlackBerry 4.0
June 2007 Casino Royal
System Engineer
Mission: Extend a Windows 2000 / SQL2000 cluster
➢ Audit / guidance
➢ Define a migration plan for NT4/2003
Environment: Windows NT4, 2000, MS SQL server, Cluster
June 2005 to May 2007 SDIS-13
System Engineer
System Manager / team leader:
➢ Manage exploitation team with 3 people
➢ Change management
➢ Planning
➢ External contractors
Project manager: (team of 2 persons + external contractors)
➢ NTFS Security project
➢ Migration of Etrust r8 Antivirus
➢ Migration of IP Plan
➢ Citrix presentation server migration
➢ Installation & configuration of an HP SAN
➢ Deployment of branch offices
➢ Build a master for Workstation
➢ Tune Active directory Infrastructure
➢ Manage Exchange 2003 infrastructure (upgrade, exploitation)
Environment: Windows NT 2000/03 – Active Directory 2003 – Exchange 2003 –remote sites
– Citrix XPa PS4 (4 servers + data store SQL 200), Antivirus E-Ttrust,
HP Data Protector, Servers Linux
November 2005 ASF
System engineer
➢ Migration of a domino infrastructure to Exchange 2003
➢ POC
Environment: Windows 2003, Lotus Domino V6, Cluster Microsoft, Exchange 2003, Double
Take, Baie SAN HP EVA
May 2005 to July 2005 IBP
Consultant Active Directory
➢ Active Directory Migration
Environment: Windows NT 2000/03 – Active Directory 2003 – Exchange 2000 –IEAK 6 –
Multi domains, multi forests
December 2004 to January 2005 Airbus Training
Architect Active Directory
Migration of a NT4 domain to an Active Directory
➢ POC with one Active Directory 2000 forest (like production domain)
➢ Installation: DC, DNS et DHCP
➢ Conception / Validation Active directory Architecture:
➢ Directory design
➢ Organizational Unit design
➢ Group policies objects / Active Directory hardening
➢ Delegation plan
➢ Trust relationship between domains
➢ Migration plan:
➢ Define a migration policy
➢ Administration document
Environment: Windows NT4 2000 – Active Directory
August 2004 to December 2004 Gaz du Sud-ouest
System Administrator
➢ Migration from NT4 to Active Directory 2003
Environment: Windows NT4 2000 – Active Directory, Lotus Notes V5.5
June 2002 to August 2004 TOTAL
System Administrator
Exploitation / Production
➢ Migration from NT4 to Active Directory 2003 + Windows XP
➢ Managing masters for workstations and laptops.
Environment: Windows NT4 2000/03 – Active Directory, RIS, SMS 1.2, Citrix, SAN EVA