Completed following projects;
*Loading wafer plate to conveyor with two kuka robot for Nestle UK (All design & Project Management)
*Loading steel roll to specific machine with robot for Uss USA (All design & PM)
*Picked tire tread from runing conveyor to shelf car Bridgestone USA (All design & PM)
*Loading unloading cartesian robot for water jet machine for Bosch Rexroth (Germany)
*Robotic Packaging station for Serapak company
Project Manager
Gumus Arslan
2月 2016 - 8月 2017 (1 年, 6 个月)
I was project manager for turnkey robotic application, and completed following projects
*Robotic sand casting coatining with camera, robot workobject coordinates defined with camera, pick it up and turning in coating pool
*Robotic sand cast assembly line: 3 loading conveyor around of robot and firstly robot get picture sand cast parts by camera and assembly parts in order finally screwing some surface for complete assembly operation
*Cartesian robot drew to paint line onto glass.
Project Manager and Line Designer
Trigon Robotic
7月 2013 - 1月 2016 (2 年, 6 个月)
*Robotic cnc loading station
*Special design gripper for cnc loading operation
*Developed patented robotic cnc loading station for cnc (patents included station software)
*Robotic automatic screwing station
*12 station rotary table automatic screwing machine
*Robotic deburring station for bottom surface of safety shoes
*Bus seat screwing with 6 axis robot
*Robotic handling to induction machine
*Robotic handling to washing machine
*Robotic pres tending
*Robotic handlig from plastic injection