Project West
$15-25 USD/小时
We want to be able to predict production throughput which is based on several variables: Number of staff to run machine operations, Efficiency, down time, impact to staff due to Covid, number of changeovers, number of lines running versus target
项目ID: #32772087
关于项目
有3名威客正在参与此工作的竞标,均价$23/小时
Hi, hope you are doing well. The problem with the prediction of your throughput time can be done by building a linear regression model with the Dependent variable as the throughput time and the remaining variable as in 更多