Move new site to root and change scripts (modified oscommerce)
进行中
已发布的
Nov 5, 2013
货到付款
$10-45 USD
货到付款
进行中
货到付款
Site is configured on [url removed, login to view] and should be moved to [url removed, login to view]
The old site can be deleted (except phplist under the /nieuwsbrief folder)
All the configure files and database files should be changed and checked.
The site must run perfectly.
Products are loaded through [url removed, login to view] so the scripts must work too (some configure files there too).
Also, phplist must work like before. So don't delete that. If necessary, move the phplist db to the new db.
项目ID: #5095900
关于项目
11个方案
远程项目
活跃的Nov 5, 2013