Find Jobs
Hire Freelancers

You have to design the selection strategy of the best Load Carrier Available at a Location to maximize a courier company profit.

₹600-1500 INR

已关闭
已发布将近 6 年前

₹600-1500 INR

货到付款
There are total n Truck or Load Carrier in a city, each Truck /Load Carrier can be in any of the three status Load Status 1. Its in middle of road and taking assignment from a location lets say a to b. or 2. Its waiting at location b and its completely empty and waiting for its next assignment ... or 3. It has already reached at location b, and doing unloading... We don't know how much time its going to take for unloading. Lets say L1,L2,L3,L4......Li ( are nth Load Carrie/Tucksr in a system ) Now Each Load Carrier has its own respective variables 1. Type of Vehicle, e.g there are 5 varieties of Load Carrier e.g V1,V2,V3,V4,V5 2. Each L Load carrier per KM rate is different . e.g L1 runs at 30INR/KM, L2 runs at 20 INR/KM etc. 3. Each L Load carrier has its own monthly cycle. e.g lets say L1 cycle is (8th March to 7th April), L2 has cycle from (15th March to 14th April) etc. 4. Each L Load carrier has its own minimum KM Guranteee run. Its the minimum cost that the courier company has to bear for each Load Carrier irrespective of whether the Load Carrier moves or just stays idle. e.g L1 minimum KM run is 4000 KM , which means its rate is 30 x 4000 = 120,000 INR for time period (8th March to 7th April), similarly L2 minimum KM run is 3800 KM and its rate should be like 20 x 3800 = 76,000 INR for (15th March to 14th April). After each minimum KM run , each load carrier rate increases by 20% Lets talk about profit making e.g. i) After 4000 KM for L1 ( between time period 8th to 7th its price ) the price per KM is 36 INR per KM. During period (8th March to 7th April) lets say by 4th April, L1 has already run 4000 KM and now on 4th April there is an assignment request of Load where it has to cover 600 KM which means by 7th April the L1 price ideally will be 4000 * 30 + 600 * 36 = 141,600 INR ii) L2 (period 15th March to 14th April) , its doing unloading at a location and we dont know how much time its going to unload , so that we can assign it the next assignment. It has run 2700KM so far Ideally if it gets picked the price will be 76,000 . This is Low but it has still 10 days left in its cycle. Should you pick or not ? iii) Now if we have any other Load Carrier available on a location L5 whose minimum KM run is 3600KM, per KM rate is 22 KM , its cycle is (6th March to 5th April), but it has run 3100 KM so far , ideally this should be picked. why because total KM run 3100 + 600 = 3700 KM price is 3600 * 22 = 77,000 + extra KM (100 * (22 + 20%22) ) = 81,840 and its cycle is getting ended next day, so utilize it. The strategy is to utilize each Load Carrier to its minimum km run during its cycle
项目 ID: 17221786

关于此项目

2提案
远程项目
活跃6 年前

想赚点钱吗?

在Freelancer上竞价的好处

设定您的预算和时间范围
为您的工作获得报酬
简要概述您的提案
免费注册和竞标工作
2威客以平均价₹1,325 INR来参与此工作竞价
用户头像
Summary: Experienced developer with a good history of working in the information technology and financial services industry. Strong engineering professional with a B-tech and M-tech degree focused in Computer Science and Engineering from Indian Institute of Technology, Kharagpur. Skilled in algorithms and data structures, using Python and Java, low level and high-level system designing.
₹1,250 INR 在1天之内
0.0 (0条评论)
0.0
0.0

关于客户

INDIA的国旗
DHANBAD, India
0.0
0
会员自5月 22, 2018起

客户认证

谢谢!我们已通过电子邮件向您发送了索取免费积分的链接。
发送电子邮件时出现问题。请再试一次。
已注册用户 发布工作总数
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
加载预览
授予地理位置权限。
您的登录会话已过期而且您已经登出,请再次登录。