Find Jobs
Hire Freelancers

Write a Microsoft Project VBA Macro to Create a Summary Sche

$30-250 USD

已取消
已发布大约 12 年前

$30-250 USD

货到付款
Overview The task is to create a Microsoft Project Macro that will automatically create separate summary schedule from details contained within the base schedule. A numbers column is used in the base schedule to indicate the tasks and summary tasks that need to appear in the summary schedule. A text column is used in the base schedule to indicate the predecessor and successor linking that needs to appear in the base schedule. Creating the Summary Schedule • The summary schedule shall be created in a separate instance of Microsoft Project (i.e. not within the same project). • The project standard calendar for the summary schedule shall be the same as the base schedule • The summary schedule calendar options for Hours per day, Hours per week and Days per month calculations shall be the same as the base schedule • All tasks in the summary schedule shall be auto scheduled. • Column Number1 in the base schedule contains either a 0,1 or 2 against each task. 0 represents that the tasks is not to be included in the summary schedule. 1 represents that it is a summary task (or level 1) in the summary schedule. 2 represents that it is a normal task (level 2) in the summary schedule. • Summary schedule level 1 task names shall be a dynamic link to the corresponding task name in the base schedule. • Summary schedule level 2 task names, start dates, finish dates and % complete shall be a dynamic link to that of the corresponding task in the base schedule. Predecessor Links • The summary schedule predecessor links for each task shall be captured in the Text26 column of the base schedule. • The predecessor text in the base schedule will indicated the base schedule task ID. • A comma will separate multiple predecessors Formatting • The gantt chart bar for each group of level 2 tasks in the summary schedule shall be coloured a different colour. • The order of colouring for each group shall be: 1. 4626167 2. 13020235 3. 10642560 4. 5880731 5. 5066944 6. 12419407 7. 8210719 8. 5474707 9. 16738047 10. 6750156 • If there are more than 10 groups of tasks in the summary schedule the colouring shall start again from the top. Saving • Once created the summary schedule shall be saved. • The summary schedule file path shall be the same as the base schedule. • The summary schedule file name shall be the same as the base schedule with the addition of the word “Summary” and the date. The format shall be: base schedule file name & “- Summary – yyyymmdd” Rights • I shall be able to view, update and change the macro once it has be submitted • All rights to the code shall belong to me
项目 ID: 1519519

关于此项目

4提案
远程项目
活跃12 年前

想赚点钱吗?

在Freelancer上竞价的好处

设定您的预算和时间范围
为您的工作获得报酬
简要概述您的提案
免费注册和竞标工作
4威客以平均价$205 USD来参与此工作竞价
用户头像
Please check the PM.
$219 USD 在8天之内
4.5 (2条评论)
2.4
2.4
用户头像
I have Microsoft experience as a SDET and I can handle this projet. In one of my projects in MS, I have done similar work for my manager.
$250 USD 在10天之内
0.0 (0条评论)
0.0
0.0
用户头像
hi i am Civil Engineer I Expert in MS Project more than 7 year
$200 USD 在7天之内
0.0 (0条评论)
0.0
0.0
用户头像
I'm a beginner in freelancer. But I have 10-years developer. I am using MS Project for project management. And I have much experience on developing with MS Project. I can do your project.
$150 USD 在5天之内
0.0 (0条评论)
0.0
0.0

关于客户

AUSTRALIA的国旗
Scarborough, Australia
5.0
1
付款方式已验证
会员自2月 6, 2012起

客户认证

谢谢!我们已通过电子邮件向您发送了索取免费积分的链接。
发送电子邮件时出现问题。请再试一次。
已注册用户 发布工作总数
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
加载预览
授予地理位置权限。
您的登录会话已过期而且您已经登出,请再次登录。